Ferrox

Migration & AI infrastructure

Move the database.
Keep the uptime.

Ferrox Fusion moves your on-prem Oracle, Postgres, and SQL Server estates onto autonomous infrastructure in as little as 11 weeks, with a rollback window on every cutover. 214 enterprises migrated since 2019. Zero failed cutovers.

No credit card. A senior engineer replies within one business day, not a bot.

47% lower 3-year TCO vs. self-managed on-prem
11wk median time from kickoff to first cutover
99.995% measured uptime across managed fleets, 2025
0 failed production cutovers to date

Four ways in, one control plane

Pick an entry point. Every path lands on the same fabric - same billing, same audit log, same on-call.

What moved, in their words and numbers

2.3M

rows migrated per minute during Meridian Freight's 41-terabyte cutover, finished 6 hours ahead of the maintenance window.

Query latency, p95, before & after - Castellan Insurance claims database

Before
340ms
After
88ms
“We cut over 90 seconds after go and nobody in the call center noticed. That's the whole review.”

Dana Okafor, VP Infrastructure — Harlow Municipal Utilities

Bring the last legacy box.

Send us your current topology — we'll return a fixed-price migration plan within five business days, no discovery-call theater.

Request the plan